Eagle Eye Metals (ASX: EYE) has identified significant lode gold potential at the Kourouba prospect, which is hosted within the Dankassa Gold Project in Mali.
Phase two reverse circulation drilling comprising 18 homes for 1600 metres at the prospect continued to discover broad zones of gold mineralisation, with the latest highlights including:
- 21 metres at 1.01 grams per tonne (g/t) gold from 18 metres;
- 15 metres at 1.25 g/t gold from 16 metres;
- 7 metres at 1.01 g/t gold from 30 metres; and
- 6 metres at 1.13 g/t gold from 44 metres.
The program was designed to follow up results from the phase one drill program completed in July, and to test for continuity of higher grade gold zones along strike and at depth within the prospect.
The highlights from phase one (announced in August) included 32 metres at 0.8g/t gold from 78 metres, 12 metres at 1.67g/t gold from 26 metres, and 7 metres at 1.12g/t gold from 16 metres.
Boosting the potential at the project even higher, historical hits include, 10 metres at 5.75g/t gold, 20 metres at 2.17g/t gold, and 12 metres at 1.81g/t gold.
Adding some proximity spice to the drilling program, Dankassa is within 200 kilometres of the Morila 7 million ounce project and the Siguiri 5 million ounce project - highlighting major gold deposits can be developed in the region.
Dankassa is located 110 kilometres south of Bamako, the capital of Mali, and is readily accessible by a sealed highway and gravel roads.
Adding to the infrastructure is that high voltage power passes within 5 kilometres of the project, and a town that services a hydro-electric power scheme 40 kilometres to the south.
Plus 60 metre mineralised zones
Importantly - the recent drilling further confirms that mineralisation occurs in broad, moderately dipping, and geologically continuous zones.
Significantly the combined width of these zones is very broad, exceeding 60 metres in places, with mineralisation at Kourouba hosted by intensely hematite-feldsparchlorite altered granodiorite.
The character of mineralisation and widespread distribution of gold at Kourouba suggests significant lode gold potential within the broader prospect area.
News flow to ramp up in coming weeks
Additional drilling and reconnaissance work was also recently undertaken within the broader Kourouba prospect, which was conducted in parallel with the reverse circulation program.
This includes the recently completed 6,150m of aircore drilling and a further 6,000 metres of auger drilling to evaluate other targets within the Dankassa project.
The outcome is that the company anticipates that new high priority targets will be delineated and that further evaluation with follow-up aircore and / or reverse circulation drilling will be warranted.
These results are pending and set to be announced in the next few weeks.
Exploration continues at two more projects
In other Eagle Eye news, field programs are also underway at both of the company’s other projects, including the Korindji Gold Project in Mali and the Basawa Gold Project in Liberia. Results are expected to be released over coming months.